As at 10th March 2017, the following construction works have been completed at Alter Ego premium class residential complex (7 Laboratornyi Lane, Kyiv):
Residential block A:
- monolithic frame construction (vertical) at the level of 26th floor
- horizontal slabs construction at the level of 25th and 26th floors
- vertical partitions construction at the level of 25th and 26th floors
- aluminum window elements installation up to 14th floor
- assembly of double glazed windows up to 19th floor
- interior stairs construction