As at 22th September 2017, the following construction works were carried out at Alter Ego premium class residential complex (7 Laboratornyi Lane, Kyiv):
Residential block A:
- brick laying works (internal walls) – 79% complete
- windows installation – 99% complete
- flooring works in apartments and public areas at the level of 16th-21th floors
- balconies protective structures installation – 65% complete
Residential block B:
- brick laying works (internal walls) – 80% complete
- windows installation – 97% complete
At the site:
- external water supply system installation – 95% complete
- external power supply system installation – 80% complete
- insulation works in the parking – 85% complete
Alter Ego residential complex comprises two 24-storey residential blocks. The total area of the complex is 43.6 thousand sq m. Areas of the 360 apartments vary from 52 to 170 sq m.
The internal infrastructure of the complex will include a fitness center, restaurant, shops, and other amenities.
We are glad to answer all your questions and assist with selection of an apartment or an office!
+38 (044) 290 30 82
Провулок Лабораторний, 7
https://www.facebook.com/alter.ego.tmm/
https://www.youtube.com/channel/UCLB3mSwSIFteqVWYsmm9HhQ